критичн пут
Generally, but not always, the sequence of schedule activities that determines the duration of the project. Generally, it is the longest path through the project. However, a critical path can end, for example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint. See also critical path method.
0
0
Paranda seda
- Sõnaliik: noun
- Sünonüüm(id):
- Blossary:
- Valdkond/domeen: Business services
- Category: Project management
- Company: WSDOT
- Toode:
- Akronüüm-lühend:
Muud keeled:
Mida öelda tahate?
Terms in the News
Featured Terms
Valdkond/domeen: Fruits & vegetables Category: Fruits
suvo grožđe
A dried grape. Raisins have a higher sugar content and a different flavor from grapes. Raisins are eat out-of-hand and used in cereals, puddings, ...
Kaastöötaja
Featured blossaries
Browers Terms By Category
- Fuel cell(402)
- Capacitors(290)
- Motors(278)
- Generators(192)
- Circuit breakers(147)
- Power supplies(77)
Electrical equipment(1403) Terms
- Film titles(41)
- Film studies(26)
- Filmmaking(17)
- Film types(13)
Cinema(97) Terms
- Meteorology(9063)
- General weather(899)
- Atmospheric chemistry(558)
- Wind(46)
- Clouds(40)
- Storms(37)
Weather(10671) Terms
- Bridge(5007)
- Plumbing(1082)
- Carpentry(559)
- Architecture(556)
- Flooring(503)
- Home remodeling(421)